We have begun the construction of a second greens nursery beside the 7th tee. This is to use in combination with our existing nursery for any repairs that maybe needed. Having extra area will let us have more mature turf available in times of need.
Removal of old cart path and tree stumps
Working existing soil to prepare for surface drainage
Drain lines back filled with pea stone and beginning of greens mix installation
Finishing grade - just a little more sand cap to install
The two main things needed to finish this project is the installation of irrigation and the final prep of the seed bed. We will be spreading our aeration cores and overseeding soon to give the area lots of time to establish before next season.