Thursday, 10 March 2011

Pond Restoration

The pond on #5 is now 95% complete. The contractor will be back in the spring to clean up around the edges of the ponds and top up the stone wherever necessary. Also, they will clean up where their machines have been travelling and where the material they cleaned out of the ponds has been placed.
This is the retaining wall on the walk path to the 5th green. We also stabilized it with some more material and topped it up with stone.